technology‑review.com

Roadmap ④ · Available individually · €19 · web roadmap + A1 poster · Version 1.0 · As of 2026-08-19

Hydrogen & Synthetic Fuels

From hype to a niche with weight: where hydrogen is irreplaceable, where it loses — and what costs, networks and quotas decide by 2036

Buy roadmap — €19 Already purchased? Sign in

Roadmap Hydrogen & Synthetic Fuels as paper panel — retrospective since 2020, outlook to 2036, four layers

Poster · A1 portrait

The roadmap as a poster

All 51 milestones in four layers with rationale, dependencies, maturity, key figures, ADL classification and recommended action — set for printing at A1 portrait (594 × 841 mm), still legible at A2. Vector PDF, searchable text.

Sharing within organisations welcome; modification and commercial re-use only with permission.

1 Executive summary (excerpt)

Hydrogen has gone through a full expectation cycle since 2020. 2020/21: national and European strategies, 40 GW of electrolysis by 2030, electrolyser makers’ share prices up tenfold. 2023–2025: the disillusionment — electrolysers got more expensive instead of cheaper, power prices made green hydrogen in Germany two to three times as expensive as grey, fewer than ten percent of announced projects reached a final investment decision, Ørsted, BP, Shell and Equinor cancelled ventures, the European Court of Auditors called the targets unrealistic. Installed in Germany today: around 0.2 GW; the target was 10 GW.

The roadmap does not conclude that hydrogen fails, but that it becomes smaller and more concrete. It is irreplaceable where there is no electric alternative: as feedstock in refineries, ammonia and methanol production (today ~95 million t worldwide, almost entirely fossil), in the direct reduction of steel, and — via derivatives — in long-haul shipping and aviation. There, quotas (RED III: 42 % renewable hydrogen in industry by 2030; ReFuelEU: 1.2 % e-kerosene from 2030), CBAM and the IMO levy create binding demand. Hydrogen has lost in passenger cars and building heat; in trucks and power plants it remains an option. Technically the cost threshold is approaching — Chinese electrolysers below $300/kW, high-temperature electrolysis, imports from Iberia, the Gulf and North Africa below €4/kg by around 2029 — but in Europe green hydrogen stays subsidy- and quota-driven well into the 2030s.

2 What you get

Buy roadmap — €19

3 What a roadmap looks like

The freely accessible showcase roadmap Robotics & Humanoid Systems shows structure, depth and poster exactly as you get them here.

4 Questions about buying

What exactly am I buying?
Access to the web roadmap (permanent, tied to your e-mail address, sign-in by link without password) and the poster as PDF/PNG for download — as of the time of purchase (version and date are printed on page and poster). Later updates are not included.
How does payment work?
Via Stripe (card, Apple Pay, Google Pay, SEPA direct debit and others). You receive a receipt or invoice by e-mail. Price €19; no VAT is charged (German small-business rule, Section 19 UStG).
Right of withdrawal?
Digital content: by purchasing you request immediate provision and acknowledge that your right of withdrawal thereby expires — this is stated explicitly once more before payment. Details in the terms of purchase.
For teams?
Access is personal. For sharing within a company contact us: info@operation-zukunft.de.